Take a look at some of the projects Gill Insulation have successfully completed in the past for a wide variety of clients.
Completed
Cambridge
By Faye Bramley
We have had a team of engineers working on ‘Project Atria’ in Cambridge for almost a year now, with only a small amount of work left to complete.
The spec for this project includes Thermaduct board, Proclad Sheeting, Isover ductwrap, Phenolic Section, Stucco Aluminium cladding & PIB.
Once complete, this building will be the largest cardiothoracic centre in Europe.
September 2021




Completed
Nottingham
By Faye Bramley
Gills have been working on this local project since Autumn 2019, installing insulation and trace heating throughout the site.
The spec for this project includes phenolic foam section, stucco aluminium cladding, thermally insulated jackets, mineral fibre section/wrap, PIR boards and Proclad sheeting.
September 2021

Completed
Clapham
By Faye Bramley
Insulation works carried out in Clapham, Summer 2020.
We have been working on several South London schools over the past few months – these photos show the external insulation works recently completed on the Clapham school.
The specification: Thermaduct board enclosed in white Proclad sheeting & identified in accordance with DW: 144.
September 2021


Completed
Bishop Auckland
By Faye Bramley
Insulation works carried out at Bishop Auckland Compressor Station, Autumn 2018.
The photo shows the completed works. The specification for this project was 50mm Crimp wrap with a layer of acoustic barrier & then enclosed in stucco aluminium cladding..
Autumn 2019
Slough
By Faye Bramley
These photos show the installation works carried out at a recent project in Slough throughout 2017

Completed


New Leisure Centre in Worcester
By Faye Bramley
These photos show the installation works carried out at the new Leisure Centre in Worcester. This project was circa £100k for trace heating & insulation which was completed between October and December 2016.

Completed

The Moor at Sheffield
By Admin
This project we carried out for Rotary Building Services and the builder was BAM Construction which was a very fast track project with a contract value of circa £273k
Completed
Leeds Arena
By Admin
This project we carried out for Rotary Building Services and the builder was BAM Construction which was a very fast track project with a contract value of circa £273k


Completed

Chesterfield Hospital Phase 1
By Admin
This project we carried out for N G Bailey Limited
– the pictures show External Chilled Water Pipework which has been insulated using Foil Rockwool section taped and enclosed using 24swg Stucco Aluminium Cladding riveted and identified to BS: 1710 – with mastic at all joints and removable aluminium boxes on all the valves and flanges (The valves and flanges are measured by Gill and manufactured on site at the Gill Head Office in Nottingham).
The contract value was circa £100k
Completed


Completed
Tesco - Berwick Upon Tweed
This project we carried out for LX Engineering – the picture shows External Circular ductwork which has been insulated using Phenolic Flatwrap and White Ventureclad. The contract value was circa £50k
Completed
Warner Bros Studios
By Admin
This project we carried out for Derry Building Services in Newark who are part of Bowmer & Kirkland.
This project was very fast track and the majority of the services insulated were at heights of 20 metres. The overall project value was circa £600k and the workmanship carried out by Gill was second to none, look at some of the photos attached.