top of page
PROJECTS PAGE PIC.jpg
Gill Insulation

Projects

Take a look at some of the projects Gill Insulation have successfully completed in the past for a wide variety of clients.

Cambridge

Completed

Cambridge

By Faye Bramley

 

We have had a team of engineers working on ‘Project Atria’ in Cambridge for almost a year now, with only a small amount of work left to complete. 

 

The spec for this project includes Thermaduct board, Proclad Sheeting, Isover ductwrap, Phenolic Section, Stucco Aluminium cladding & PIB.

 

Once complete, this building will be the largest cardiothoracic centre in Europe.

 

September 2021

Removable Covers
Removable Covers
Removable Covers
Nottingham One
Nottingham

Completed

Nottingham

By Faye Bramley

 

Gills have been working on this local project since Autumn 2019, installing insulation and trace heating throughout the site. 

 

The spec for this project includes phenolic foam section, stucco aluminium cladding, thermally insulated jackets, mineral fibre section/wrap, PIR boards and Proclad sheeting.

 

September 2021

CLAPHAMSTRIPPIC.jpg
Clapham

Completed

Clapham

By Faye Bramley

 

Insulation works carried out in Clapham, Summer 2020.

 

We have been working on several South London schools over the past few months – these photos show the external insulation works recently completed on the Clapham school.

 

The specification: Thermaduct board enclosed in white Proclad sheeting & identified in accordance with DW: 144.

 

September 2021

CLAPHAM
Bishop Auckland
Bishop Auckland

Completed

Bishop Auckland

By Faye Bramley

 

Insulation works carried out at Bishop Auckland Compressor Station, Autumn 2018. 

 

The photo shows the completed works. The specification for this project was 50mm Crimp wrap with a layer of acoustic barrier & then enclosed in stucco aluminium cladding..

 

Autumn 2019

Nottingham Two
Gill Insulation

Nottingham

By Faye Bramley

 

Installation works carried out in Nottingham in 2018. 

 

The ductwork has been insulated with Thermaduct boards and enclosed in 0.7mm “Merlin Grey” Plastisol cladding.

 

2018

Completed

Gill Insulation
Slough

Slough

By Faye Bramley

 

These photos show the installation works carried out at a recent project in Slough throughout 2017

 

Slough

Completed

Gill Insulation
WORCESTERPIC.jpg
Worcester

New Leisure Centre in Worcester

By Faye Bramley

 

These photos show the installation works carried out at the new Leisure Centre in Worcester.  This project was circa £100k for trace heating & insulation which was completed between October and December 2016.

Worcester Leisure Centre

Completed

Sheffield
Gill Insulation

The Moor at Sheffield

By Admin

 

This project we carried out for Rotary Building Services and the builder was BAM Construction which was a very fast track project with a contract value of circa £273k

Completed

Leeds Arena

Leeds Arena

By Admin

 

This project we carried out for Rotary Building Services and the builder was BAM Construction which was a very fast track project with a contract value of circa £273k

Leeds
LEEDSARENA.png

Completed

Gill Insulation

Chesterfield Hospital Phase 1

By Admin

 

This project we carried out for N G Bailey Limited

– the pictures show External Chilled Water Pipework which has been insulated using Foil Rockwool section taped and enclosed using 24swg Stucco Aluminium Cladding riveted and identified to BS: 1710 – with mastic at all joints and removable aluminium boxes on all the valves and flanges (The valves and flanges are measured by Gill and manufactured on site at the Gill Head Office in Nottingham). 

 

The contract value was circa £100k

 

Completed

ChesterfieldPics
Chesterfield Hospital
TESCO PIC.jpg
Tesco

Completed

Tesco - Berwick Upon Tweed

This project we carried out for LX Engineering – the picture shows External Circular ductwork which has been insulated using Phenolic Flatwrap and White Ventureclad. The contract value was circa £50k

Completed

Warner Bros Studios

By Admin

 

This project we carried out for Derry Building Services in Newark who are part of Bowmer & Kirkland. 

 

This project was very fast track and the majority of the services insulated were at heights of 20 metres. The overall project value was circa £600k and the workmanship carried out by Gill was second to none, look at some of the photos attached.

WARNERBROPICS3
WARNERBROPIC
Warner Bros

Contact Details

33 Ebury Road, Nottingham NG5 1BB

0115 9626043

Fax: 0115 969 1688

sales@gillins.com

Office Hours

You can contact us within hours below.

 

Monday - Thursday: 7.30am to 5pm

Friday: 7.30am to 4pm

SMAS Logo
BM Trada
PASMA
IPAF
SSSTS
TICA
bottom of page